-
Fixed the Last Activity timestamp not updating after a task is deleted
-
Fixed the Admin Center Users search resetting to the full list right after a match appears
-
Fixed the Projects count in Admin Center reflecting the pagination size instead of the actual total
-
Fixed the Slack integration manage table showing a raw column key instead of "Status"
-
Fixed Poya days not appearing on the holiday calendar
-
Fixed missing translations on the Guest Members page
-
Fixed users being unable to sign in with both Google and email/password on the same account
-
Fixed the required field indicator appearing twice in the Time Log Range configuration popup
-
Fixed the task list fully reloading after a bulk status change instead of updating in place
-
Fixed single quotes in project names rendering as escaped characters instead of plain text
-
Fixed the attachment download button not responding in the comments section
-
Fixed mention email notifications not delivering to Outlook accounts
-
Fixed text entered in a custom column from the task drawer not saving
-
Fixed the status color not updating immediately after a status change from the task drawer
-
Fixed a phase change from drag-and-drop not reflecting in the task drawer's phase field
-
Fixed the "View Full History" button label for clarity in the Updates chat history
-
Fixed the attachment icon appearing in the Updates section, which doesn't support attachments
-
Fixed inconsistent Files UI and colors between the Project Files tab and the Files page
-
Fixed Your Library showing 0 tasks and 0 phases for saved project templates
-
Fixed shared task templates failing to import into another organization with a "Template not found" error
-
Fixed an "Unknown Error" blocking task template creation
-
Fixed project settings not displaying their current state to members, who couldn't see enabled/disabled values even though they couldn't edit them
-
Fixed the "Auto-Assign Parent Phase to Subtasks" toggle being disabled and duplicated in Project Settings
-
Fixed the profile dropdown labeling Team Leads as Admin
-
Fixed switching teams reloading the page and reverting to the previous team instead of completing the switch
-
Fixed two success messages appearing after deleting a guest member
-
Fixed the team list not scrolling when a user belongs to many teams
-
Fixed team switching failing when the user is inside a project
-
Fixed the Generate and Copy Link button staying disabled after selecting a project for a guest invite
-
Fixed the Team Members table header text rendering incorrectly
-
Fixed custom date ranges silently overwriting the start date instead of validating it against the end date
-
Fixed the View Details button erroring on the Team Report page
-
Fixed chart data being cut off on the Estimate vs Actual report at certain screen sizes
-
Fixed the task filter including tasks outside the selected custom time range
-
Fixed the project count being wrong when filtering by category in Reports
-
Fixed the Workload table view showing only headers, no task data, after expanding a member row
-
Fixed edited workload capacity not saving or displaying the new value
-
Fixed assigned task counts showing 0 in the Workload view despite tasks being assigned
-
Fixed a "Something Went Wrong" error when navigating to Workload
-
Fixed the Recently Logged table on Home not updating in real time after task changes from the task drawer
-
Fixed long status names breaking the layout on the Home Overview and Log Time pages
-
Fixed the displayed time range being wrong when logging time for today
-
Fixed Client Portal status filters (Invited, Not Invited, Expired) not filtering client records correctly
-
Fixed Portal status tags having poor contrast in dark mode
-
Fixed Planner filters (Projects, Clients, Status, Priority) not filtering the schedule
-
Fixed guest members appearing in the Schedule member list
-
Fixed pinned pages not loading when navigating to Projects or Finance
-
Fixed the sidebar navigation expand/collapse icon not responding
-
Fixed the Change Currency link redirecting to a 404 page
-
Fixed the Finance Overview table not updating Actual Cost and Variance after Task List finance changes